Gosikhurd Dam Opens 19 Gates, 80,882 Cusecs Water Released; Wainganga River Below Warning Level

Be
0
Gosikhurd Flood Live Updates,Goshikhurd,Gosikhurd,Bhandara,Gosikhurd Flood Live 2025,Gosikhurd Flood Live,Bhandara Gosikhurd Dam,Gosikhurd News,Bhandara News,
Gosikhurd Dam Opens 19 Gates

Bhandara: Today morning, at 8:00 AM, the Gosikhurd Dam in Bhandara district had 19 out of its 33 gates opened by 0.5 meters each. This release is discharging 2,290 cubic meters per second (cumecs) of water, which is equivalent to 80,882 cubic feet per second (cusecs), into the downstream areas.

According to water level readings recorded at Wadsa, Ashti, and Chichdoh Barrage monitoring stations, the Wainganga River is currently flowing below the warning level. Authorities are keeping a close watch on the situation while ensuring safe water management from the dam.


Post a Comment

0 Comments
Post a Comment (0)

#buttons=(Ok, Go it!) #days=(20)

आपला ब्राउझिंगचा अनुभव अधिक चांगला व्हावा, तुम्हाला तुमच्या आवडीच्या मजकुराची शिफारस करता यावी, यासाठी ही वेबसाईट कुकी किंवा तत्सम तंत्रज्ञान वापरते. आमची वेबसाईट वापरणं सुरू ठेवून आपण आमच्या अधिक जाणून घ्या


गोपनीयता धोरणाला आणि कुकी धोरणाला

Ok, Go it!
To Top
-->